Completion of a task

Did I tell you that the doors are back on?

All of them. Well, the three that were stripped and redressed in a fine wax. Eventually, everything went to plan, which was great. I did have to rewrite the plan somewhat to make that happen, but adaptability is important in making heaven from self imposed hell.

The stripping of the doors was straightforward. It was very easy and went to plan, but that was largely because someone else was employed to come in and take them off, to be returned ready for reinstallation.

Reinstallation averaged 2 weeks per door, which was reasonable since its important to plan all building or DIY work properly. Then if, or when, it does completely go wrong, the surprise of failure is tempered by the relief that at least the first part of the job is done.

Of course, the doors needed waxing and handles adding. There was an opportunity to do this early, when one of them fell from the hinges, but it seemed at the time that the immediate priority of having non-fatal doors should take priority, and indeed it did.

A year later, almost to the year, the surfaces have been sanded and waxed. The instructions advised application of the wax via paintbrush. This, it seems, is a lie. In fact, the wax should be applied by being delicately dabbed to the surfaced from a lightly dampened gnats handkerchief. Anything greater that this is likely to leave the doors with a white finish that screams ‘sand me’ in words that are fortunately quiet and easy to ignore.

Door handle mechanisms were sourced from a unique supply source that took the original versions and added an almost inperceptible increase to the width. This became more perceptible when hammering the mechanisms into place; and even more perceptible when having to remove a now broken lock from a door, dismantling it from within the door’s firm grip.

Nonetheless, doors are back. The cracks in the frames repaired with larger and more cracking screws. The shattered pieces of the doors edges from fights with the finessing hammer have now been reattached with joinery acumen, and glue. And the adaptive plan is completed, at least until it is repeated with the doors from upstairs.

Subscribe
Notify of

This site uses Akismet to reduce spam. Learn how your comment data is processed.

0 Comments
Inline Feedbacks
View all comments